Home » Blog » Kitchen Remodel Timeline: How Long Each Phase Takes (2026)
Kitchen Remodel Timeline: How Long Each Phase Takes (2026)
Quick answer: A kitchen remodel takes 2–4 weeks for a cosmetic refresh, 6–10 weeks for a mid-range remodel, and 10–16 weeks for a full gut renovation. Custom cabinets (6–8 weeks fabrication) are the longest single step, followed by design and material selection (2–6 weeks before construction starts). The #1 cause of delays is ordering materials after demolition instead of before. Call (607) 389-0071 for a realistic schedule for your project.
Phase-by-Phase Breakdown
| Phase | Typical duration | Notes |
|---|---|---|
| Design & planning | 2–6 weeks | Layout, selections, permits |
| Cabinet fabrication | 6–8 weeks | Runs parallel to planning — order early |
| Demolition | 2–5 days | Fastest phase |
| Rough-in (plumbing, electrical) | 1–2 weeks | Inspections add time |
| Drywall, paint, flooring | 1–3 weeks | |
| Cabinet install | 3–7 days | |
| Countertop template + install | 2–3 weeks | Template only after cabinets are set |
| Backsplash, fixtures, appliances | 1–2 weeks | |
| Punch list & cleanup | 2–5 days |
The 5 Most Common Delays
- Materials ordered late — cabinets and appliances should be ordered before demolition, not during
- Change orders mid-project — every change restarts the scheduling chain
- Permit and inspection waits — structural, plumbing, and electrical changes need sign-offs
- Backordered appliances — confirm lead times in writing before you demo
- Unseen damage — water damage or outdated wiring found during demolition adds 1–2 weeks
Can You Use Your Kitchen During the Remodel?
For cosmetic and mid-range remodels, usually partially — set up a temporary kitchen with a microwave, toaster oven, and mini-fridge in another room. Full gut renovations typically mean 6–10 weeks without a working kitchen; plan meals accordingly.
Good to know
FAQs
Custom cabinet fabrication at 6–8 weeks. Order cabinets during the design phase so they arrive when demolition ends — this single decision saves more time than anything else.
A cosmetic refresh (paint, hardware, backsplash, lighting, counters) can finish in 2–4 weeks. Anything involving new cabinets or layout changes cannot.
Cosmetic updates generally do not. Moving plumbing or gas lines, changing electrical circuits, or removing walls does — your contractor should handle permits as part of the scope.
Before demolition. Appliance lead times run 2–12 weeks, and the cabinet design depends on exact appliance dimensions.